Golf Putting Green - Monterey Series
Perfect your short game with the Players Series Monterey, an advanced modular putting green system exclusively from XGrass. Built with interlocking base panels and surfaced in Tour quality Putting and Fringe turf, the Monterey is engineered by industry experts for golfers who take their practice seriously.
The Players Series system delivers the look and performance of a professionally installed putting green without the disruption, mess, or cost of a full construction project. Thanks to its innovative panel design, the Monterey installs in a matter of hours and can be relocated whenever your space needs change, making it a smart choice for backyards, rooftops, showrooms, and commercial putting facilities alike.
The Player Series Modular Putting Green Kits are available in 3 other sizes:
What's Included
- Geotextile Fabric
- Players Series Base System
- XGrass One Putt Putting Turf
- XGrass Luxury 1st Cut Fringe Turf
- (4) 4" Aluminum Cups
- (4) Premium Ball Retriever Flags
Monterey Modular Putting Green Features
- Interlocking modular base panels for fast, tool-light assembly
- Tour quality putting surface for true, consistent ball roll
- Realistic fringe turf for authentic chip and short game practice
- Pre-drilled cup panels for accurate hole placement
- Fully modular and relocatable when your layout changes
- Recycled polypropylene copolymer base construction
- Designed and engineered by putting green industry experts
Specifications
- Dimensions: 18' x 28'
- Coverage: 504 sq ft
- Hole Locations: 4
- Putting Turf: XGrass One Putt
- Fringe Turf: XGrass Luxury 1st Cut
- Base Panels: Polypropylene Copolymer (Recycled Materials)
- Cups: (4) 4" Aluminum
- Flags: (4) Premium Ball Retriever Flags
- Warranty: 5 Years (Turf & Panels), 1 Year (Accessories)
The Monterey Putting Green Ideal Space Requirements
- Minimum area: 18' x 28' flat or near flat footprint
- Maximum slope: 3%
- Suitable surfaces: compacted stone dust base, concrete, or level ground with proper prep
- Indoor or outdoor use
- Works well in backyards, rooftops, showrooms, and commercial putting facilities
Shipping Information
Monterey Putting Green ships in 2-3 business days over the standard order processing time (<24H)
Shipping is not free and it ships freight. The recipient needs to be present at the time of delivery and assume responsibility for unloading the shipment.
Quick Install Guide
Step 1: Prepare Your Location
Select or prepare a relatively flat area with no more than a 3% slope. Add compacted stone dust as needed, then lay down the included geotextile fabric.
Step 2: Assemble the Panel System
Assemble the Players Series panel system, positioning the pre-drilled cup panels wherever you want your hole locations to be.
Step 3: Install Cups, Turf, and Flags
Install the cup systems, then lay the pre-cut putting and fringe turf. Cut the turf at the hole locations and place your flags.
FAQ
How long does installation take?
The Monterey can typically be installed in just a few hours thanks to its modular panel design and pre-cut turf.
Can I move the putting green after installation?
Yes. The modular base panel system is designed to be relocated if your space needs change.
What kind of surface do I need before installing?
A relatively flat surface with no more than a 3% slope is required. Compacted stone dust is recommended for outdoor installs where a firm, level base isn't already present.
How many hole locations does the Monterey have?
The Monterey includes 4 hole locations with pre-drilled cup panels for accurate placement.
What is covered under warranty?
The turf and base panels are covered for 5 years, and accessories such as cups and flags are covered for 1 year.
Is this suitable for commercial use?
Yes. The Players Series Monterey is engineered for both residential backyards and commercial putting facilities such as showrooms and practice centers.
Shipping Information
Monterey Putting Green ships in 2-3 business days over the standard order processing time (<24H)
Shipping is not free and it ships freight. The recipient needs to be present at the time of delivery and assume responsibility for unloading the shipment.